• Improvement of the conditions of operation in the tank the boiler, such as:
• Removal of sediment in tank The boiler
• Installation of 1 valve sectioning (knife and/or throttle) at the entrance of the tank the boiler.
• Improvement of the conditions of operation of the main line of system Tláhuac- Netzahualcóyotl and increased control of flow rates in the system.
• Installation of a master station telemetry for monitoring, control of flow and other parameters in the Residence South and the installation of 4 remote stations of telemetry in different critical points for the measurement of parameters such as a first stage of managing the system Tláhuac-Netzahualcóyotl through telecontrol and telemetry.
• Installation of macro-meters as a first step to control flow rates in a more efficient way in the system.
• Rehabilitation of 3 wells in the leg Santa Catarina, with the installation of pumps of high efficiency and centrifugal separators of sand on which was needed to retrieve flow with a better efficiency.
• Checking of hydraulic parameters, energy coefficients and recurrence of transients, once the equipment and accessories have been installed, as well as the calibration of the equipment and accessories of the previously installed wells and verification of the correct operation of the reimplementation of the operation logic.
• Implementation of improvements for transient mitigation in the Santa Catarina branch. Installation of Speed variators to control transients in the Santa Catarina 3-well system.
• Verification of energy savings by means of a written report which presented the annual savings calculation based on consumption in current CFE receipts per well, where the maximum demand was assessed, the consumption of KWh invoiced, power factor and the same measure of CFE.
• Implementation of the operation logic throughout the system TLÁHUAC-netzahualcóyotl and including the branches Mixquic-Santa Catarina, Santa Catarina and the branches left and right of drive tláhuac.