• Rehabilitation of 6 wells of the Tláhuac branch, installation of high efficiency pumps and centrifugal separators of sand in each one of the wells where it was required.
• Re implementation of the logic of operation of the Wells of the branch Tláhuac to rehabilitate, to work with the new operating conditions and to incorporate the flows of these in an efficient manner and with a reduction of substantial transients to the other flows produced by the other wells of the system, in order to make them work together.
• Checking of hydraulic parameters, energy coefficients, calibration of equipment and accessories, as well as verification of the correct operation of the new Operation logic.
• Verification of energy savings based on the efficiency of the motor-pump unit, presented in kilowatts consumption current time per well, where the maximum demand was assessed.