• Realization of works for recovery of flows in 4 wells of the branch Teoloyucan
• Realization of works for recovery of flows in 3 wells of the Ramales the Kings-Ferrocarril and Tizayuca-Pachuca.
• Adaptations, calibrations and substitutions of equipment and accessories for the mitigation of transients in the wells of the Teoloyucan branch to obtain a hydraulic improvement of the branch and thus to obtain a more safe and efficient operation of the system.
• Implementation of a logic of operation according to the new operating conditions of the system, having installed the equipment and accessories for the mitigation of transients and to have completed the activities of recovery of flows the branch Teoloyucan.
• Checking of hydraulic parameters, energy coefficients and recurrence of transients, once the equipment and accessories have been installed, as well as the calibration of the equipment and accessories of the previously installed wells and verification of the correct operation of the operating logic.
• Checking the energy savings through written report where it presented the annual calculation of savings with basis on the receipts of CFE current at that time by well and those received later than the work of improving efficiency, where it was assessed the maximum demand, consumption Kwh invoiced, power factor and the measurement itself of CFE.